Something on the lines of if your company facility is using over X amount of energy the majority of that has to be from a green source such as solar power. What would happen and is this feasible or am I totally thinking about this wrong

  • JimmyMcGill@lemmy.world
    link
    fedilink
    English
    arrow-up
    2
    ·
    10 months ago

    They don’t require high internet speed at all. Why do you say that? You have to keep up with the network that creates a couple MBs of data every 10mins. That’s it. You need processing power and as such electricity but none of that requires high speed internet, quite the contrary. You can get away with a mobile data in most places.

    • jaycifer@kbin.social
      link
      fedilink
      arrow-up
      1
      ·
      10 months ago

      There’s a sentence in the article I linked to in another comment that, in the city the article was about, there were data centers for Microsoft and similar companies that had required high-speed internet infrastructure be built in town despite its small size. I suppose, based on what you said, that speed wouldn’t be too essential but you would want stability to maintain a connection. Satellite internet probably wouldn’t be great for that (maybe Starlink is?) in which case you still want to run some kind of cable.